Contact Us

Looking for a Product? Have any questions? Reach out to Us. We will get back to you within a day!


California
United States

+1 (510) 899-1340

Service AI specializes in providing accessories and spare parts for laboratory instrumentation in a niche area of the market. Our business strategy focuses on meeting the unique needs and requirements of popular equipment that is widely used but no longer manufactured or supported by its original manufacturers.   With over 25 years of experience in supporting scientists with laboratory instrumentation and spare parts, our knowledgeable and dedicated team takes pride in ensuring that every recertified or new instrument and spare part we supply is fully tested and certified by a manufacturer-trained engineer. We guarantee that our products will work and provide proof of performance documentation when applicable.  

We only supply refurbished laboratory instrumentation that our team of experts are trained and certified to work on, ensuring that we deliver high-quality instruments and reliable service to our customers.

At Service AI, we understand the importance of safe shipping and delivery, and we take utmost care in ensuring that our products are delivered safely to our clients. Additionally, we offer professional installation services upon request.

Beckman Coulter Optima Ultracentrifuge Installation Procedure

Lab Pundit

Service AI offers a comprehensive range of spare parts and fully certified and rigorously tested laboratory instruments, accompanied by detailed proof of performance documentation.

Explore Ask LabPundit for answers to commonly asked questions about our laboratory equipment. Should you have further inquiries, please don't hesitate to contact us via email.

Beckman Coulter Optima Ultracentrifuge Installation Procedure

Service AI

Important Note: For electrical installation and checkup as mentioned below, always involve a certified electrician for power requirements. We also strongly recommend that a trained engineer install and check out your Beckman Coulter Optima L ultracentrifuge, and train your staff on the proper usage of the ultracentrifuge and rotors prior to use.

Power:

a. Check for correct wall receptacle and voltage at the outlet. Power required is 180 to 264 Volts AC measured as shown. It is advisable to test the line voltage at the plug while the instrument is accelerating and cooling; therefore, we would strictly recommend that the ultracentrifuge always be installed by a Beckman trained engineer. Service AI has Beckman Coulter trained service experts. You can email us at support@serviceai.us, or call us at our technical support line at +1-510-899-1340 for more information.

b. Remove console cover, front panel and top cover.

c. Make sure jumper connector on the power supply boards plugged into the correct voltage range socket J52 A, B, or C. (Select the jumper for the lowest voltage reading during maximum power consumption.)

J52 VOLTAGE RANGE

A 180 - 206

B 207 - 233

C 234- 264

Physical Installation Procedure:

a. Position ultracentrifuge in desired location. Maintain 6" minimum clearance at rear and 3" minimum clearance at each side.

b. Position the four pads provided under the leveling legs. Mark the position of each pad on the floor.

c. Roll out instrument away from pads.

d. Glue (epoxy) pads to floor.

e. Roll instrument back into position and screw the four leveling legs down into the pads until they have bottomed out.

f. Now screw each leveling leg down five additional turns. Make sure all four casters are off the floor.

NOTE: A solenoid inter-lock prevents the chamber door from being opened during operation and/or with the power off. The chamber door can be opened with the door handle only when the power to the ultracentrifuge is on and the vacuum is off.

g. Open the chamber door (see note above). Level the ultracentrifuge as if it had only three legs. Adjust level by placing the spirit level on the drive shaft (crown) and adjust the leveling legs so the air bubble is centered. First level it front- to- rear by adjusting the left front and left rear legs. Then level it left to right by adjusting the right front leg only. (Make sure you do not tilt the instrument). Screw in the right rear leg until it just touches the pad. Now screw it down 1/4 turn more. This does not affect the level of the instrument.

spirit level.jpg

h. After instrument is leveled, make sure all four casters are off the floor and all four leveling legs are still bottomed out.